
Product Description
The MBBR process adds a certain amount ofsuspended packing (biofilm carrier)to the reactor, and different microorganisms
concentrate in the biofilm in the protected area of the
falling-rising tone. Some anaerobic bacteria or facultative aerobes were grown inside the vector, and aerobic bacteria were grown outside.
Each carrier is a micro reactor, in the aerobic treatmentsystem through blast aeration, or in anaerobic treatmentsystem under the action of
stirring, ensure that wastewater and biological carrier of biofilm extensive and frequent contact, improve the efficiency of the system at the
same time,strengthen the biofilm microbial update, maintain and improve the activity of the biofilm. The suspension carrier forms a more
complex composite ecosystem with the original activated sludge, and the biofilm attached to the carrier greatly increasesthe active biomass
in the reactor. Under the combined action of the suspended activated sludge and the biofilm on the surface of the suspended carrier, the
impact load resistance of the system is greatly improved, and the efficiency ofsewage treatment and the ability to stabilize the effluent quality
are improved
Product Feature
High efficiency biocarrier MBBR suspension packing is a high quality high density polyethylene (HDPE) material,soaked in
wastewater for a long time will not degrade, and will not be toxic to microorganisms.
(1).Highhydrophilicity,strongsurfaceattachmentability;
(2)highbiologicalactivity,shortfilmhangingfilmperiod;
(3)Strongimpactresistanceandstableoperation;
(4)Lesssurplussludgeproduction;
(5)Highvolumeload,highfillingrate,andsmallfloorarea;
(6)Easytooperate,easytomaintain,costsaving;
(7)Norenovation,easytoupgradeorexpand;
(8)Theservicelifeislong,andthepackinglifeismorethan15years.
Process Description
01 is not limited by the poolshape, no need to transform the treatment pool, make full use of the original treatment pool capacity;
02 Greatly accelerate the reaction speed, compared with the activated sludge method, the reaction efficiency isincreased by 5-10 times;
03 Nitrification and denitrification process at the same time, can be good nitrogen and phosphorus removal;
04 Head loss is small, not easy to block, without backwashing;
05 Put the Longxiang MBBR filler directly, without installing the bracket;
06 MBBR biofiller rolls and flowsfreely in the water and cutsthe bubblesto improve the dissolved oxygen in the water,save
energy consumption and improve the efficiency











